Compliance

Safety documentation every industrial gas supplier should digitize

What to track for pressure tests, certifications, and audit trails — before an inspector asks.

CylStock Team Updated 20 Aug 2026 2 min read

Hydrotest certification, pressure test logs, and visual inspection records are the safety documentation an inspector will ask for first — and paper registers are the most common reason a gas supplier fails to produce them on time.

Cylinder safety compliance is not optional paperwork; it is the record that proves a cylinder currently in circulation was actually tested and certified safe within its due cycle.

What safety documentation actually gets checked

  • Hydrotest due dates per individual cylinder, not a generic batch estimate
  • Visual inspection logs covering dents, rust, and physical damage before refilling
  • Leak test results recorded before a cylinder goes back into circulation
  • Valve and fitting checks at each fill cycle
  • Test certificates tied to a specific cylinder number, retrievable on demand

Why this is hard to maintain on paper

A mid-size filling plant processing hundreds of cylinders a day cannot reliably cross-reference paper hydrotest registers against every cylinder passing through the line. The result is either compliance drift (cylinders filled past their due date without anyone noticing) or an inspection-day scramble to reconstruct records that should have existed all along.

Digitizing the compliance record

The fix is tying test data to the same cylinder record used for stock and billing, so a hydrotest due-date alert appears automatically before a cylinder is filled, and a full test history is retrievable per cylinder number in seconds, not hours, when an inspector asks.

Book your free demo

See CylStock running on your own cylinder business — no hidden charges, no setup fees, no obligation. Support and training included from day one.

  • 30-minute live demo
  • No obligation to buy
  • Support 24/7
  • Tailored to your business